Toneman Development Corporation

Kennedy Engineered Products

Kennedy Engineered Products

  • Client

Kennedy Engineered Products

  • Location

Palmdale, CA

  • Business Type

Commercial

  • Project Description

This 11,900 square foot building was constructed for an OEM automobile parts manufacturer in Palmdale. Utilizing a design build process and a pre-engineered steel building, the project saved 3 months on the construction schedule.  Combined with our pre-engineered steel building partner, CBC Steel Buildings, we provided a column free building that allowed the manufacturing process to be free flowing. The building orientation allowed the use of natural daylighting that cut the lighting as well as heating and cooling.

Toneman
Serving SoCal’s
Construction and
Development Needs

About Us

Quick Links

Toneman
Serving SoCal’s
Construction and
Development Needs